This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revisionNext revision | Previous revisionNext revisionBoth sides next revision | ||
convert_for_different_target [2012/01/06 13:58] – ab | convert_for_different_target [2012/01/06 14:00] – ab | ||
---|---|---|---|
Line 3: | Line 3: | ||
Moving a project from one Zbrain Target to an other is done in two steps: | Moving a project from one Zbrain Target to an other is done in two steps: | ||
- | - Replace all refnums with refnums from the new target.\\ | + | - Replace all refnums with refnums from the new target |
- | - Set the [[configure_target|Target configuration]]. | + | - Set the [[configure_target|Target configuration]]. |