This shows you the differences between two versions of the page.
Both sides previous revisionPrevious revision | Next revisionBoth sides next revision | ||
convert_for_different_target [2012/01/06 13:58] – ab | convert_for_different_target [2012/01/06 13:59] – ab | ||
---|---|---|---|
Line 3: | Line 3: | ||
Moving a project from one Zbrain Target to an other is done in two steps: | Moving a project from one Zbrain Target to an other is done in two steps: | ||
- | - Replace all refnums with refnums from the new target.\\ | + | - Replace all refnums with refnums from the new target |
- Set the [[configure_target|Target configuration]]. Or you can generate a new project with the same vis for the new target. This sets the target configuration automatically. | - Set the [[configure_target|Target configuration]]. Or you can generate a new project with the same vis for the new target. This sets the target configuration automatically. | ||